Excavation & Construction¶
Points for this task: Excavation & Construction¶
Total Points Available: 100
Activity 1: Leave Start Gate (5 points)¶
Leave the start gate and descend the lander ramp
Activity 2: Rock Clearing (30 points)¶
Point breakdown per rock:
Small/Medium rocks (4 points each)
2 points for moving
2 points for placement
Large/Huge rocks (7 points each)
3 points for moving
4 points for placement
Rock specifications:
Small: ≤8×8×8 cm, <1 kg (2 rocks)
Medium: ≤11×11×11 cm, 1-3 kg (2 rocks)
Large: ≤15×15×15 cm, 3-5 kg (1 rock)
Huge: ≤17×17×17 cm, 5-10 kg (1 rock)
Activity 3: Excavation & Berm Construction (30 points)¶
Excavate and deliver regolith to marked area (2m × 0.7m):
5 points: Any volume
10 points: ≥50 cm³
15 points: 50-500 cm³
20 points: 500-1000 cm³
25 points: 1000-2000 cm³
30 points: ≥2000 cm³
Activity 4: Paver Construction (35 points)¶
30 points: Coverage of 1.1m² area with connected pavers
5 points: Justifying relevance and utility of constructed feature