Skip to content

Excavation & Construction

Points for this task: Excavation & Construction

Total Points Available: 100

Activity 1: Leave Start Gate (5 points)

  • Leave the start gate and descend the lander ramp

Activity 2: Rock Clearing (30 points)

Point breakdown per rock:

  • Small/Medium rocks (4 points each)
  • 2 points for moving
  • 2 points for placement
  • Large/Huge rocks (7 points each)
  • 3 points for moving
  • 4 points for placement

Rock specifications:

  • Small: ≤8×8×8 cm, <1 kg (2 rocks)
  • Medium: ≤11×11×11 cm, 1-3 kg (2 rocks)
  • Large: ≤15×15×15 cm, 3-5 kg (1 rock)
  • Huge: ≤17×17×17 cm, 5-10 kg (1 rock)

Activity 3: Excavation & Berm Construction (30 points)

Excavate and deliver regolith to marked area (2m × 0.7m):

  • 5 points: Any volume
  • 10 points: ≥50 cm³
  • 15 points: 50-500 cm³
  • 20 points: 500-1000 cm³
  • 25 points: 1000-2000 cm³
  • 30 points: ≥2000 cm³

Activity 4: Paver Construction (35 points)

  • 30 points: Coverage of 1.1m² area with connected pavers
  • 5 points: Justifying relevance and utility of constructed feature